National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
Simulating Laser-Material Interactions
California-based Lawrence Livermore National Laboratory (LLNL) oversees the National Ignition Facility (NIF), which ...
Keynote: Democratizing In Silico Ablation R&D via Simulation Apps
In this keynote talk from COMSOL Day: MedTech, Marcela Mercado Montoya of IN SILICO STEM introduces the capabilities ...
Multiphysics Simulation Drives Smart City Technology
Traditional power boxes are bulky and too large. To design a power box that is more space-conscious, modular, and ...
Multiphysics Simulation Helps Miele to Optimize Induction Stove Designs
The induction stove was designed to meet a consumer need for better precision and speed than traditional stoves. ...
