SIMULATION SUCCESS STORIES

National Grid Predicts Underground Cable Performance with Simulation

Énergie

David Scott, UK National Grid, United Kingdom

U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.

  •  /
1
Loading PDF...

Suggested Stories

Getting Touchy-Feely with Touchscreen Design

Getting Touchy-Feely with Touchscreen Design

We rely on capacitive touchscreens whenever we interact with a smartphone, MP3 device, or car video screen. ...

Undocking Better Boat Landing Designs for Offshore Wind Turbines

Undocking Better Boat Landing Designs for Offshore Wind Turbines

Wood Thilsted, a leader in offshore engineering, used structural analysis to design boat landings that can withstand ...

The Sound of Perfection Thanks to the Modeling of Acoustic Metasurfaces

The Sound of Perfection Thanks to the Modeling of Acoustic Metasurfaces

At the École Polytechnique Fédérale de Lausanne (EPFL), engineers have designed an acoustic metasurface that could be ...

Get an Inside Look at an Innovative Rainwater Drainage System

Get an Inside Look at an Innovative Rainwater Drainage System

Step into a busy neighborhood in Copenhagen, Denmark, to see how a multidisciplinary urban planning team used ...