Prysmian Uses Simulation for High-Voltage Cable Design
M. Bechis
Prysmian, Italy
The design and testing of high-voltage cables for terrestrial and submarine applications is paramount to Prysmian's business model. A fundamental challenge in designing power transmission systems is optimizing the cables so that they can reliably deliver the required steady-state current while remaining at, or preferably below, the maximum permissible operating temperature. Incorporating multiphysics simulation into the R&D workflow at Prysmian has allowed engineers to design and test cables before constructing prototypes, while also considering unfavorable thermal environments that can be difficult to control in actual experiments. Multiphysics models with transient analysis allowed for evaluating thermal performance of parameterized cable geometries, while incorporating factors such as daily variations in solar irradiation and even current load changes instead of the usual constant current condition. The expanded simulation capabilities at Prysmian have led to improved procedures for cable design and better service to both customers and colleagues.
Suggested Stories
Heating Buildings with Solar Energy Stored in Sand
Polar Night Energy used thermal modeling to optimize the design of a heat storage and distribution system powered by ...
Greening the Heart of the City: An Urban Rooftop Drainage System Inside a Garden Fence
TL-Engineering, a simulation consultant, teamed up with a professor, civil engineer, and sound barrier company to ...
Simulation Summit Panel: The Multiphysics Roadmap
Speakers from NVIDIA, Stanford University, and MathWorks, as well as COMSOL and moderator DE 24/7, discuss the future ...
Picking the Pattern for a Stealth Antenna
Stealth airplanes and ships avoid radar detection by optimizing the shape of surfaces to reflect away from the radar ...
