National Grid Predicts Underground Cable Performance with Simulation
David Scott, UK National Grid, United Kingdom
U.K. National Grid bears responsibility for maintaining the high-voltage transmission network in the U.K. Determining accurate cable ratings (maximum load capacity while staying within temperature ranges) is a significant effort, since they have to maintain reliability, safety, and affordability while dealing with tightly constrained areas, cable congestion, and environmental impacts on cable lines. With multiphysics simulation, U.K. National Grid was able to model the changes in cable performance that stem from soil dryness, cracking, and the proximity of other cables and maximize capacity at minimal costs. Modeling also helped them optimize new cable route installations in accordance with existing routes.
Suggested Stories
Les merveilles insoupçonnées du rayonnement thermique pour le chauffage, le refroidissement et la fonte de la neige
Viega conçoit des systèmes de chauffage et de refroidissement par rayonnement pour des applications résidentielles et ...
Amener la simulation multiphysique sur les chantiers de construction
Le temps, la température, le choix des matériaux, les conditions météorologiques ou encore la technique de coulée sont ...
Keynote: Simulation of MEMS Sensors at Bosch
In this keynote talk at the COMSOL Conference 2025 Amsterdam, Daniel Maier of Bosch discusses MEMS sensors and the ...
La conception générative accélère le développement des piles à combustible à hydrogène
Le Toyota Research Institute of North America (TRINA) travaille sur les véhicules à hydrogène. L'équipe TRINA utilise ...
